Our client required the installation of 6 vehicle charging points under the Workplace Charging Scheme in the desired locations within the company’s staff car park. The charging points had to be installed promptly, prior to the Managing Director taking delivery of an electric vehicle.
After an initial site survey, it was established that 3 dual point charge points were required across two locations with the necessary ground works. One charging point involved a simple installation, while the other two points required the installation of additional external distribution board.
Our client now has 6 available EV charging points for their staff to use at work. The charging points went into immediate use. The project was delivered on time, on budget and with the client delighted at the outcome.
“Yes we are pleased. Myself and my Directors are happy with the end result and also with the way Russ worked on the project. The charging points are already being used. To be fair, it’s not often that we leave contractors alone to get on with their work without a permanent escort. So that says a lot.
DSA has since carried out other electrical work for us and we will also consider you for any future outsourced electrical work as we believe in supporting local companies.”