Hawksmoor was appointed to upgrade the laundries of six care homes. This work included replacing the existing gas appliances with electrical appliances. Hawksmoor needed to determine whether the existing electrical installation in the laundries had capacity for the planned new electrical appliances.
DSA Electrical performed a Data Logging exercise, installing the data logger for the required period of time to determine the existing electrical usage at different points throughout each 24 hour period in the care homes.
At the end of the required time period, we were able to issue the client with a report demonstrating they did have capacity for the planned new electrical appliances. DSA Electrical were then contracted to successfully deliver the new electrical installations for the six laundry upgrades.